Foreign Aided Project (EFAP)

An Asian Development Bank (ADB) Assisted Project namely ‘Sindh Flood Emergency Reconstruction  Project (Emergency Flood Assistance Project (EFAP) is also included  in ADP 2023-24 as an On-Going Scheme.

  • Competent Forum  ECNEC
  • Date of approval  6th December, 2022
  • Total Length  848.18 KMs
  • Total Cost     Rs.48400 Million (90.86% ADB Loan Rs.43974.9million , 9.14% Gos share Rs 4425.0 Million)
  • Allocation(2023-2024)  Rs. 1500 Million
  • Status        Pre-qualification Process completed. The bid opening was   held on 12-10-                      2023 and work will be started in Nov, 2023